Fault-to-fix: intake and evidence form

This form captures a fault at the moment it is reported, whether it is a machine stopping, a customer complaint about a delivered item or a failed service visit. The person who receives the report fills it in, and the technician or supervisor who acts on it uses it, so nobody has to ask the reporter the same questions again.

When to use it

Use it for every fault, however small, the first time it is reported by a staff member, customer or visitor. A fault that is only mentioned in passing and never written down is the one that returns, so start the form even before the cause is known. Keep a few printed copies at the front desk, on the shop floor and in the service vehicle, or keep the same fields in a shared sheet, so the form is never more than a moment away.

The template

FieldWhat to enterSource recordOwner
Fault numberNext number in the fault logFault logPerson receiving the report
Date and time reportedExact time, not just the dateCall, message or visit notePerson receiving the report
Reported byName, phone number, role or customerCall or messagePerson receiving the report
Asset, product or serviceMachine name and tag, batch or invoice number, or service visit referenceAsset list, invoice, job sheetPerson receiving the report
LocationBranch, line, room or customer addressSite listPerson receiving the report
What happenedSymptom in plain words, when it began, how oftenReporter's accountReporter, written by receiver
Evidence collectedPhoto, video, reading, sample kept, error noteFiles and sample labelSupervisor
SeverityStops work, slows work, risk to safety, cosmeticSeverity guideSupervisor
Assigned to and by whenTechnician name and promised timeRosterSupervisor
Customer or user toldDate, time and what was saidMessage or call recordPerson receiving the report

How to fill it

  • Fault number: never skip or reuse a number, even for duplicates. Link duplicates to the first one.
  • Reported by: a phone number matters, because the technician may need to call back.
  • Asset, product or service: use the tag or batch number, not "the big machine".
  • What happened: record the reporter's words first. Add your own observations in a separate line.
  • Evidence collected: a photo of the fault plus one showing the asset tag is enough. Keep a sample of a defective item and label it with the fault number.
  • Severity: use your own written guide, and raise it later if more is learned, but note the change.
  • Assigned to and by when: a name and a time, not a department.

Example row

FieldWhat to enter
Fault number0452
Date and time reported5 Nov, 10:40
Reported bySunita Rao, retailer, 98XXXXXX10
Asset, product or serviceBatch 24-118, 40 cartons, invoice 3187 dated 28 Oct, worth ₹86,400
What happenedSeals leaking on about 6 cartons, noticed on opening, not before
Evidence collected4 photos, 2 leaking packs kept and labelled 0452
SeveritySlows sales, no safety risk
Assigned to and by whenVikram (quality), visit by 6 Nov, 5 pm

Review and sign-off

  • The supervisor checks that each form is complete before work starts, and signs it.
  • The operations head scans the week's forms for missing fields and repeat assets.
  • Escalate to the owner at once if severity is set to risk to safety, or if the same batch or asset appears in more than one form within the week.

Keeping it up to date

  • Add a field when you find yourself asking the same question twice, and remove one that is always blank.
  • Keep photos and samples with the form number as the file or label name.
  • Keep forms for the period your CA or the law requires, and at least as long as any warranty or complaint period you offer.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →