Idea-to-improvement: role and approval matrix
This matrix settles who may do what when an improvement idea moves from a suggestion to a changed standard procedure. An owner or process owner uses it to avoid two common problems: changes made on the floor with nobody's approval, and good ideas stuck because nobody knows who can say yes. It works for a workshop, a shop, a salon or a clinic.
When to use it
Fill it when you start a formal improvement routine, when a person with approval authority joins or leaves, and when a spending limit changes. Pin the current version where supervisors can see it, and refer to it whenever someone asks whether they are allowed to try something.
The template
| Decision or step | Prepares | Approves | Proof required | If rejected or sent back |
|---|---|---|---|---|
| Log an idea | Any team member | Supervisor | Entry in the idea register | Supervisor explains the reason to the person within a week |
| Accept for baseline measurement | Supervisor | Process owner | Named measure and period | Idea stays in the register with a note |
| Start a small trial | Process owner | Supervisor, or owner if spend is above the limit | Trial sheet with end date | Trial plan is reworked and resubmitted |
| Extend or stop a trial | Process owner | Supervisor | Interim figures | Trial stops and the old method returns |
| Change the written standard | Process owner | Owner | Trial result and revised procedure | Old standard stays in force |
| Verify the change holds | Supervisor | Process owner | Follow-up count after the review period | Reopen the case |
Backup approvers:
| Role | Backup when absent | Spending limit | Valid from |
|---|---|---|---|
How to fill it
- Prepares: the person who writes the record or sheet. They cannot also approve the same step.
- Approves: one named role, not "management". Where a limit applies, write the rupee figure in the second table.
- Proof required: the actual document the approver must see before signing.
- If rejected or sent back: say what happens next and who tells the staff member, so ideas are never silently lost.
- Backup approvers: name a person for every approver, so a trial is not held up by one absence.
Example row
| Decision or step | Prepares | Approves | Proof required | If rejected or sent back |
|---|---|---|---|---|
| Start a small trial costing ₹4,000 for a new storage rack | Process owner | Supervisor, because spend is below the ₹5,000 limit | Trial sheet dated 3 March, end date 17 March | Trial plan reworked, resubmitted within a week |
Review and sign-off
- The owner approves the matrix and signs it each time it changes.
- Review it every quarter, and after any trial where it was unclear who could approve.
- Escalate to the owner if two approvers disagree, a step is skipped, or a standard was changed without the proof listed.
Keeping it up to date
- Update the date and version each time a role or limit changes, and withdraw the old copy.
- Remove steps that are never used, and add one when an approval keeps happening informally.
- Keep old versions for the period your CA or the law requires.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →