lamp.
ResourcesPricingAbout
3 min readBy

Idea-to-improvement: role and approval matrix

This matrix settles who may do what when an improvement idea moves from a suggestion to a changed standard procedure. An owner or process owner uses it to avoid two common problems: changes made on the floor with nobody's approval, and good ideas stuck because nobody knows who can say yes. It works for a workshop, a shop, a salon or a clinic.

When to use it

Fill it when you start a formal improvement routine, when a person with approval authority joins or leaves, and when a spending limit changes. Pin the current version where supervisors can see it, and refer to it whenever someone asks whether they are allowed to try something.

The template

Decision or stepPreparesApprovesProof requiredIf rejected or sent back
Log an ideaAny team memberSupervisorEntry in the idea registerSupervisor explains the reason to the person within a week
Accept for baseline measurementSupervisorProcess ownerNamed measure and periodIdea stays in the register with a note
Start a small trialProcess ownerSupervisor, or owner if spend is above the limitTrial sheet with end dateTrial plan is reworked and resubmitted
Extend or stop a trialProcess ownerSupervisorInterim figuresTrial stops and the old method returns
Change the written standardProcess ownerOwnerTrial result and revised procedureOld standard stays in force
Verify the change holdsSupervisorProcess ownerFollow-up count after the review periodReopen the case

Backup approvers:

RoleBackup when absentSpending limitValid from

How to fill it

  • Prepares: the person who writes the record or sheet. They cannot also approve the same step.
  • Approves: one named role, not "management". Where a limit applies, write the rupee figure in the second table.
  • Proof required: the actual document the approver must see before signing.
  • If rejected or sent back: say what happens next and who tells the staff member, so ideas are never silently lost.
  • Backup approvers: name a person for every approver, so a trial is not held up by one absence.

Example row

Decision or stepPreparesApprovesProof requiredIf rejected or sent back
Start a small trial costing ₹4,000 for a new storage rackProcess ownerSupervisor, because spend is below the ₹5,000 limitTrial sheet dated 3 March, end date 17 MarchTrial plan reworked, resubmitted within a week

Review and sign-off

  • The owner approves the matrix and signs it each time it changes.
  • Review it every quarter, and after any trial where it was unclear who could approve.
  • Escalate to the owner if two approvers disagree, a step is skipped, or a standard was changed without the proof listed.

Keeping it up to date

  • Update the date and version each time a role or limit changes, and withdraw the old copy.
  • Remove steps that are never used, and add one when an approval keeps happening informally.
  • Keep old versions for the period your CA or the law requires.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →