Onboarding: role and approval matrix
This matrix says who prepares and who approves each decision during the setup of a new way of running daily operations: choosing the reporting channel, describing the business, ranking problems, confirming the first processes and reviewing the trial. It is used by the owner, the person leading the setup and the operations manager, so that nothing is decided by default or left to whoever is nearest.
When to use it
Draw it up on the first day of the setup and share it with every team head. Use it again when somebody changes role, when a branch joins, and at the end of the trial, when responsibilities are reviewed and the matrix is updated. Keep the matrix to one page. If it needs more, the setup is trying to start too many processes at once, and the first list should be shortened.
The template
Part 1: the authority matrix.
| Decision or step | Prepared by | Approved by | Proof needed | If rejected |
|---|---|---|---|---|
| Pick the reporting channel the team will use | Owner | Setup lead checks everyone can use it | Message from each team member confirming access | Choose another channel, or give help to those who cannot use it |
| Describe the business and how it works | Setup lead | Operations manager | Business profile sheet | Return to the setup lead with notes |
| Rank the most urgent problems | Operations manager | Owner | Ranking sheet with rupee estimates | Re-rank after a discussion with department heads |
| Choose the first processes to set up | Owner | Setup lead | Process list with start dates | Reduce the list to a number the team can handle |
| Name the owner, doer and approver for each process | Setup lead | Operations manager | Role list | Fix the missing names before the start date |
| Approve the trial period and its dates | Setup lead | Owner | Dated trial plan | Reset the dates, or shorten the scope |
| Review the trial and change responsibilities | Operations manager | Owner | Trial notes, list of changes | Extend the trial by a set number of days |
Part 2: who covers when someone is absent.
| Role | Main person | Cover person | Cover applies for |
|---|---|---|---|
| Owner decisions | |||
| Setup lead | |||
| Operations manager | |||
| Accounts lead |
How to fill it
- Prepared by and Approved by: use real names beside each role. The same person should not prepare and approve one step, unless the business has only one person.
- Proof needed: the document, message or note that shows the step happened, with a date.
- If rejected: a concrete action, such as "re-rank after discussion by Friday".
- Cover person: choose someone who knows the process and write the dates the cover applies.
- An approval that concerns payroll, tax filings or statutory records is a statutory matter. Check the current rule on the official portal or with your CA before acting.
Example row
| Decision or step | Prepared by | Approved by | Proof needed | Outcome |
|---|---|---|---|---|
| Rank the most urgent problems | Rekha, operations manager | Owner, Mr Iyer | Ranking sheet dated 2 Nov 2026, first-ranked problem: late collections of about ₹3,50,000 | Approved 3 Nov 2026, collections set up first |
Review and sign-off
- The owner signs the matrix with the date and gives a copy to each team head.
- Review it at the end of the trial and then every quarter.
- Escalate to the owner on the same day if any step has no named approver or if the approver is unavailable and a start date will be missed.
Keeping it up to date
- Write each change as a new dated version; keep the earlier one.
- Keep versions and the proof behind each approval for the period your CA or the law requires.
- When a person leaves, replace their name in the matrix on their last day, not later.
- Share the updated matrix in the same channel the team uses for daily updates, so that everyone sees the change on the day it is made.