Capital purchase checklist

This checklist covers buying a machine or equipment: need, quotes, warranty, installation. Tick each item at the point of work and record any failure.

0 of 12 checked

1Verify the need and supplier

  • Business need is statedMUST
  • Expected use or capacity is written
  • Budget owner is named
  • Available alternative is considered

2Compare and inspect

  • Comparable quotations are filed
  • Installation requirements are checked [VERIFY]MUST
  • Warranty and support terms are read
  • Total purchase and setup cost is calculated

3Authorise and record

  • Approval threshold is metMUST
  • Delivery inspection owner is assignedMUST
  • Operator training is planned
  • Asset register addition is confirmed
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Installation requirements are checked. This is a practical starting list, not a legal or safety certificate.

When to use it

The purchase manager uses this list when setting up or approving this activity. Allow about 10 minutes for the checks, plus time for any problem found. Work from the purchase register, PO and supplier correspondence. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: buying a machine or equipment: need, quotes, warranty, installation. First confirm business need is stated, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The purchase manager records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when comparable quotations are filed cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking expected use or capacity is written without looking at the actual item or source record.
  • Writing "done" when installation requirements are checked has not been checked.
  • Closing the sheet even though approval threshold is met is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a plastics business, adapt the references to the part, lot, machine or delivery document your team actually uses. In distribution, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the purchase manager which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the capital purchase checklist?

The purchase manager who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if business need is stated cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.