lamp.
ResourcesPricingAbout
Maintenance12 checksdailyabout 5 minutes, estimate; adjust for site

Compressor daily checklist

This checklist covers pressure, oil, drain, noise and leaks. Tick each item at the point of work and record any failure.

0 of 12 checked

1Prepare and make safe

  • Pressure indication is inside marked band [VERIFY]MUST
  • Oil sight glass is in range
  • Drain condition is checked by trained person [VERIFY]MUST
  • No unusual vibration is observed

2Inspect or restore

  • Airline leaks are reportedMUST
  • Air intake is not blocked
  • Temperature reading is within site limit [VERIFY]
  • Warning lamps are clear

3Test and hand over

  • Run hours are noted
  • Service due status is checked
  • Fault entry has been raised if needed
  • Daily check is signedMUST
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Pressure indication is inside marked band; Drain condition is checked by trained person; Temperature reading is within site limit. This is a practical starting list, not a legal or safety certificate.

When to use it

The maintenance in-charge uses this list once during the relevant working day. Allow about 5 minutes for the checks, plus time for any problem found. Work from the machine service log and maintenance register. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: pressure, oil, drain, noise and leaks. First confirm pressure indication is inside marked band, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The maintenance in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when airline leaks are reported cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking oil sight glass is in range without looking at the actual item or source record.
  • Writing "done" when air intake is not blocked has not been checked.
  • Closing the sheet even though run hours are noted is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a food processing business, adapt the references to the part, lot, machine or delivery document your team actually uses. In plastics, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the maintenance in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the compressor daily checklist?

The maintenance in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if pressure indication is inside marked band cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →