Delivery confirmation checklist

This checklist covers getting signed LR or delivery proof back after each trip. Tick each item at the point of work and record any failure.

0 of 12 checked

1Check the order and goods

  • Dispatch LR number is available
  • Promised delivery date is recordedMUST
  • Customer receiving contact is known
  • Shipment status is checked

2Prepare movement and documents

  • Signed delivery proof is requestedMUST
  • Delivered quantity is confirmed
  • Shortage or damage remarks are captured
  • Unsigned proof is escalatedMUST

3Hand over and close

  • Proof image is filed against invoice
  • Customer receipt date is recordedMUST
  • Transporter balance is updated
  • Open claims have an owner
Send it on WhatsApp

When to use it

The dispatch in-charge uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the dispatch plan, packing list and document folder. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: getting signed LR or delivery proof back after each trip. First confirm dispatch LR number is available, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The dispatch in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when signed delivery proof is requested cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking promised delivery date is recorded without looking at the actual item or source record.
  • Writing "done" when delivered quantity is confirmed has not been checked.
  • Closing the sheet even though proof image is filed against invoice is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a distribution business, adapt the references to the part, lot, machine or delivery document your team actually uses. In fabrication, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the dispatch in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the delivery confirmation checklist?

The dispatch in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if dispatch lr number is available cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →