lamp.
ResourcesPricingAbout
Compliance12 checkseach timeabout 12 minutes, estimate; adjust for site

E-invoice and e-way bill checklist

This checklist covers masters and details correct so documents are not rejected. Tick each item at the point of work and record any failure.

0 of 12 checked

1Prepare the evidence

  • Seller and buyer GSTINs are checked [VERIFY]
  • Product HSN details are reviewed [VERIFY]
  • Invoice date and number are correctMUST
  • Tax amounts agree with bill [VERIFY]

2Review for discrepancies

  • E-invoice applicability is confirmed [VERIFY]
  • IRN or acknowledgement status is checked [VERIFY]
  • E-way bill applicability is reviewed [VERIFY]
  • Vehicle and transport details match [VERIFY]MUST

3Approve and file

  • Rejected document reason is captured
  • Correction has authorised reviewMUST
  • Final documents are shared with approvalMUST
  • Dispatch file keeps valid copy
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Seller and buyer GSTINs are checked; Product HSN details are reviewed; Tax amounts agree with bill; E-invoice applicability is confirmed; IRN or acknowledgement status is checked; E-way bill applicability is reviewed; Vehicle and transport details match. This is a practical starting list, not a legal or safety certificate.

When to use it

The billing accountant uses this list each time this job or event occurs. Allow about 12 minutes for the checks, plus time for any problem found. Work from the compliance tracker and relevant portal records. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: masters and details correct so documents are not rejected. First confirm seller and buyer GSTINs are checked, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The billing accountant records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when e-invoice applicability is confirmed cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking product hsn details are reviewed without looking at the actual item or source record.
  • Writing "done" when irn or acknowledgement status is checked has not been checked.
  • Closing the sheet even though rejected document reason is captured is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a trading business, adapt the references to the part, lot, machine or delivery document your team actually uses. In engineering, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the billing accountant which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the e-invoice and e-way bill checklist?

The billing accountant who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if seller and buyer gstins are checked cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →