Factory inspection readiness checklist
This checklist covers registers, displays and floor ready for a statutory visit [VERIFY by state]. Tick each item at the point of work and record any failure.
1Prepare the evidence
- Inspection notice and scope are read [VERIFY]MUST
- Applicable registers are updated [VERIFY]
- Licence and consent copies are available [VERIFY]
- Responsible host is nominated
2Review for discrepancies
- Mandatory displays are reviewed [VERIFY]
- Machine guarding is visually checked [VERIFY]MUST
- Contract labour records are accessible [VERIFY]
- Inspection questions are answered with records
3Approve and file
- Inspector observations are written
- Corrective actions have ownersMUST
- Submission commitments are dated
- Qualified reviewer checks compliance gaps [VERIFY]MUST
Check before you rely on it. These need a check for your site or with the official source: Inspection notice and scope are read; Applicable registers are updated; Licence and consent copies are available; Mandatory displays are reviewed; Machine guarding is visually checked; Contract labour records are accessible; Qualified reviewer checks compliance gaps. This is a practical starting list, not a legal or safety certificate.
When to use it
The factory compliance lead uses this list each time this job or event occurs. Allow about 12 minutes for the checks, plus time for any problem found. Work from the compliance tracker and relevant portal records. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: registers, displays and floor ready for a statutory visit [VERIFY by state]. First confirm inspection notice and scope are read, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The factory compliance lead records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when mandatory displays are reviewed cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking applicable registers are updated without looking at the actual item or source record.
- Writing "done" when machine guarding is visually checked has not been checked.
- Closing the sheet even though inspector observations are written is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a trading business, adapt the references to the part, lot, machine or delivery document your team actually uses. In engineering, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the factory compliance lead which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the factory inspection readiness checklist?
The factory compliance lead who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if inspection notice and scope are read cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.
Read next
- Related process
- Related problem
- Related checklist
