Festival shutdown and restart checklist

This checklist covers closing safely before Diwali or a long holiday, and starting again smoothly. Tick each item at the point of work and record any failure.

0 of 12 checked

1Review what is coming

  • Last dispatches before closure are planned
  • Customer commitments are reviewed
  • Unfinished jobs have status labels
  • Critical stocks are protectedMUST

2Confirm readiness

  • Machines are shut down by authorised staff [VERIFY]MUST
  • Utilities are left in approved state [VERIFY]MUST
  • Hazardous items are stored safely [VERIFY]
  • Site security handover is recorded

3Assign and follow up

  • Restart attendance is confirmed
  • Machine checks are booked
  • Incoming orders are ranked
  • Restart approval is signed [VERIFY]MUST
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Machines are shut down by authorised staff; Utilities are left in approved state; Hazardous items are stored safely; Restart approval is signed. This is a practical starting list, not a legal or safety certificate.

When to use it

The owner or operations manager uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the owner review sheet and department status reports. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: closing safely before Diwali or a long holiday, and starting again smoothly. First confirm last dispatches before closure are planned, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The owner or operations manager records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when machines are shut down by authorised staff cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking customer commitments are reviewed without looking at the actual item or source record.
  • Writing "done" when utilities are left in approved state has not been checked.
  • Closing the sheet even though restart attendance is confirmed is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a machine shops business, adapt the references to the part, lot, machine or delivery document your team actually uses. In distribution, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the owner or operations manager which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the festival shutdown and restart checklist?

The owner or operations manager who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if last dispatches before closure are planned cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →