Hot work permit checklist
This checklist covers welding and cutting near anything that can burn. Tick each item at the point of work and record any failure.
1Check people and area
- Hot work scope and location are written [VERIFY]
- Permit is approved by authorised person [VERIFY]MUST
- Combustibles are controlled under site rule [VERIFY]
- Nearby people are informed
2Check controls and equipment
- Suitable fire response gear is at hand [VERIFY]MUST
- Gas or electrical equipment is inspected [VERIFY]
- Ventilation requirement is checked [VERIFY]
- Fire watch arrangement is confirmed [VERIFY]MUST
3Act on findings
- Work is stopped for changed conditions [VERIFY]
- Post-work area check is recorded [VERIFY]MUST
- Permit is closed by approver [VERIFY]
- Record is filed
Check before you rely on it. These need a check for your site or with the official source: Hot work scope and location are written; Permit is approved by authorised person; Combustibles are controlled under site rule; Suitable fire response gear is at hand; Gas or electrical equipment is inspected; Ventilation requirement is checked; Fire watch arrangement is confirmed; Work is stopped for changed conditions; Post-work area check is recorded; Permit is closed by approver. This is a practical starting list, not a legal or safety certificate.
When to use it
The hot work permit issuer uses this list each time this job or event occurs. Allow about 12 minutes for the checks, plus time for any problem found. Work from the site inspection register and the marked work area. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: welding and cutting near anything that can burn. First confirm hot work scope and location are written, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The hot work permit issuer records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when suitable fire response gear is at hand cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking permit is approved by authorised person without looking at the actual item or source record.
- Writing "done" when gas or electrical equipment is inspected has not been checked.
- Closing the sheet even though work is stopped for changed conditions is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a garments business, adapt the references to the part, lot, machine or delivery document your team actually uses. In engineering, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the hot work permit issuer which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the hot work permit checklist?
The hot work permit issuer who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if hot work scope and location are written cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.
Read next
- Related process
- Related problem
- Related checklist
