In-process inspection checklist

This checklist covers checks during the run, at set intervals, at the machine. Tick each item at the point of work and record any failure.

0 of 12 checked

1Identify the lot or issue

  • Current inspection plan is on machine
  • Sample frequency is known [VERIFY]MUST
  • Gauge status is current [VERIFY]MUST
  • Production lot is identified

2Inspect and control

  • Actual readings are written at inspection timeMUST
  • Rejected pieces are segregated
  • Process setting changes are noted
  • Last accepted sample is identifiable

3Decide and record

  • Out-of-limit result is escalated
  • Affected output is held for review
  • Inspector initials are recordedMUST
  • Next check time is posted
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Sample frequency is known; Gauge status is current. This is a practical starting list, not a legal or safety certificate.

When to use it

The quality inspector uses this list at the start or close of the relevant shift. Allow about 5 minutes for the checks, plus time for any problem found. Work from the inspection register and the identified lot. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: checks during the run, at set intervals, at the machine. First confirm current inspection plan is on machine, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The quality inspector records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when actual readings are written at inspection time cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking sample frequency is known without looking at the actual item or source record.
  • Writing "done" when rejected pieces are segregated has not been checked.
  • Closing the sheet even though out-of-limit result is escalated is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a pharma packaging business, adapt the references to the part, lot, machine or delivery document your team actually uses. In rubber parts, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the quality inspector which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the in-process inspection checklist?

The quality inspector who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if current inspection plan is on machine cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →