Job work material in checklist
This checklist covers counting, inspecting and matching what comes back against the challan. Tick each item at the point of work and record any failure.
1Confirm the reference
- Incoming challan refers to outward challanMUST
- Job worker reference matches lotMUST
- Returned packages are counted
- Returned weight is measured
2Check the material or location
- Work quality is checked before acceptance
- Scrap or process loss is recordedMUST
- Unfinished pieces are segregated
- Short return has written reason
3Record and release
- Outstanding balance at worker is updated
- GRN or return entry is made
- Rework is assigned an ownerMUST
- Challan is closed only after reconciliation
When to use it
The stores manager uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the challan book, stock register or stores desk. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: counting, inspecting and matching what comes back against the challan. First confirm incoming challan refers to outward challan, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The stores manager records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when work quality is checked before acceptance cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking job worker reference matches lot without looking at the actual item or source record.
- Writing "done" when scrap or process loss is recorded has not been checked.
- Closing the sheet even though outstanding balance at worker is updated is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a food processing business, adapt the references to the part, lot, machine or delivery document your team actually uses. In engineering, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the stores manager which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the job work material in checklist?
The stores manager who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if incoming challan refers to outward challan cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.