lamp.
ResourcesPricingAbout
Maintenance12 checksyearlyabout 10 minutes, estimate; adjust for site

Monsoon readiness checklist

This checklist covers roofs, drains, electricals and stored material before the rains. Tick each item at the point of work and record any failure.

0 of 12 checked

1Prepare and make safe

  • Roof leak locations are reviewedMUST
  • Rainwater drains are clear
  • Ground-level stock is raised if needed
  • Loose outdoor materials are secured

2Inspect or restore

  • Panel enclosures have no water path [VERIFY]MUST
  • Sump or pump readiness is checked
  • Goods in loading bay have rain cover
  • Emergency contact list is current

3Test and hand over

  • Previous monsoon damage is reviewed
  • Unfixed leaks have ownersMUST
  • Photographs of risk areas are kept
  • Readiness sign-off is completedMUST
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Panel enclosures have no water path. This is a practical starting list, not a legal or safety certificate.

When to use it

The maintenance in-charge uses this list during the planned annual review. Allow about 10 minutes for the checks, plus time for any problem found. Work from the machine service log and maintenance register. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: roofs, drains, electricals and stored material before the rains. First confirm roof leak locations are reviewed, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The maintenance in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when panel enclosures have no water path cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking rainwater drains are clear without looking at the actual item or source record.
  • Writing "done" when sump or pump readiness is checked has not been checked.
  • Closing the sheet even though previous monsoon damage is reviewed is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a fabrication business, adapt the references to the part, lot, machine or delivery document your team actually uses. In foundries, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the maintenance in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the monsoon readiness checklist?

The maintenance in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if roof leak locations are reviewed cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →