Production12 checksdailyabout 5 minutes, estimate; adjust for site

Production plan review checklist

This checklist covers checking tomorrow's plan against orders, material and machines. Tick each item at the point of work and record any failure.

0 of 12 checked

1Before the job

  • Open orders list is currentMUST
  • Tomorrow's dispatch priorities are shownMUST
  • Available machine hours are checked
  • Known downtime is deducted

2During setup or production

  • Raw material for planned jobs is checkedMUST
  • Outside job work returns are confirmed
  • Staffing for each line is available
  • Pending drawings are flagged

3Release and record

  • Priority changes have approvalMUST
  • Plan is shared before shift end
  • Overloaded machines have a response
  • Final plan version is dated
Send it on WhatsApp

When to use it

The production supervisor uses this list once during the relevant working day. Allow about 5 minutes for the checks, plus time for any problem found. Work from the job card and the records kept at the machine. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: checking tomorrow's plan against orders, material and machines. First confirm open orders list is current, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The production supervisor records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when raw material for planned jobs is checked cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking tomorrow's dispatch priorities are shown without looking at the actual item or source record.
  • Writing "done" when outside job work returns are confirmed has not been checked.
  • Closing the sheet even though priority changes have approval is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a garments business, adapt the references to the part, lot, machine or delivery document your team actually uses. In auto components, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the production supervisor which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the production plan review checklist?

The production supervisor who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if open orders list is current cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?