Root cause investigation checklist
This checklist covers questions to ask so the real cause is found, not just the operator blamed. Tick each item at the point of work and record any failure.
1Identify the lot or issue
- Problem statement names the failureMUST
- Affected batch and quantity are knownMUST
- Evidence is saved before cleaning
- People involved are interviewed without blame
2Inspect and control
- Cause chain uses observed factsMUST
- Each proposed cause has evidence
- Process conditions are compared with normal
- Missed detection point is identified
3Decide and record
- Permanent action addresses the causeMUST
- Action owner is appointed
- Verification method is named
- Review date is set
When to use it
The quality inspector uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the inspection register and the identified lot. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: questions to ask so the real cause is found, not just the operator blamed. First confirm problem statement names the failure, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The quality inspector records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when cause chain uses observed facts cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking affected batch and quantity are known without looking at the actual item or source record.
- Writing "done" when each proposed cause has evidence has not been checked.
- Closing the sheet even though permanent action addresses the cause is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a castings business, adapt the references to the part, lot, machine or delivery document your team actually uses. In pumps, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the quality inspector which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the root cause investigation checklist?
The quality inspector who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if problem statement names the failure cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.
Read next
- Related process
- Related problem
- Related checklist
