Shift start checklist for supervisors
This checklist covers people, machines, material and drawings in place before work starts. Tick each item at the point of work and record any failure.
1Before the shift or opening
- Today's attendance is confirmedMUST
- Shift assignments are displayedMUST
- Machine availability list is current
- Night shift issues are read
2At the point of work
- Material for first jobs is at each stationMUST
- Current drawings are at the workstations
- Tools for scheduled jobs are available
- Unfinished jobs have a named owner
3Before handover or close
- First-hour output targets are posted
- Open safety hazards are assignedMUST
- Shortage calls have an owner
- The start meeting decision list is written
When to use it
The shift supervisor uses this list at the start or close of the relevant shift. Allow about 5 minutes for the checks, plus time for any problem found. Work from the shift board, daily register or open-issues sheet. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: people, machines, material and drawings in place before work starts. First confirm today's attendance is confirmed, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The shift supervisor records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when material for first jobs is at each station cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking shift assignments are displayed without looking at the actual item or source record.
- Writing "done" when current drawings are at the workstations has not been checked.
- Closing the sheet even though first-hour output targets are posted is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a plastics business, adapt the references to the part, lot, machine or delivery document your team actually uses. In packaging, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the shift supervisor which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the shift start for supervisors checklist?
The shift supervisor who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if today's attendance is confirmed cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.