lamp.
ResourcesPricingAbout

Acceptance quality limit

The acceptance quality limit is the poorest average defect level in a continuing series of lots that is still considered satisfactory under sampling inspection.

What it means

Buyer and supplier agree it before inspection starts, often as a percentage of defective items or defects per hundred units. With the lot size and inspection level, it decides how many pieces are drawn and how many defects are tolerated before rejection. A tighter limit such as 0.65 is stricter than a looser one such as 4.0.

Example

An exporter of cotton kurtas agrees a limit of 2.5 for minor defects and 0 for major ones. For a lot of 1,200 pieces, the inspector draws the sample the plan requires, finds one loose thread, which is minor and within allowance, and the lot passes.

Records and checks

  • Record the agreed limit per defect class, the lot size and the sampling table used.
  • Verify that inspectors classify defects as critical, major or minor consistently.
  • The quality head signs the decision, and the buyer's inspector may countercheck.

Common mistakes

  • Treating the limit as a promise that no lot holds more defects than the figure, when it is a sampling criterion.
  • Agreeing the number verbally and arguing over defect classes at inspection.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →