Actual cycle time
Actual cycle time is the measured time a machine or operation really takes to complete one unit, as opposed to the standard or planned cycle time.
What it means
Standard figures come from the process sheet or a past study; actual ones come from the stopwatch, the machine counter or production records. The difference shows hidden losses such as slow running, small adjustments or operator delays. It is also used for quoting and scheduling, since delivery dates depend on real rates rather than ideal ones.
Example
The process sheet gives 30 seconds per piece on a CNC lathe. Timing 20 consecutive pieces shows 36 seconds on average, so a shift of 8 hours makes about 800 pieces rather than the planned 960.
Records and checks
- Record the part, machine, operator, date and time taken for each timed piece or sample.
- Verify by timing several cycles over different shifts, not one lucky run.
- The supervisor or industrial engineer measures it; planning updates schedules and the owner reviews gaps from standard.
Common mistakes
- Timing a single cycle and treating it as typical.
- Dividing shift hours by output and calling it cycle time, which also counts stoppages.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →