Advanced product quality planning
Advanced product quality planning is a structured, phase-by-phase method used to plan a new product or part so that quality risks are found and closed before full production begins.
What it means
Instead of fixing defects after launch, the method makes a team think ahead. It moves from planning and design, through process design, to trial production and then to feedback after launch. Each phase has outputs, such as risk analyses, control plans and measurement checks, and a review before the next phase starts. It is widely used by suppliers to vehicle makers and other buyers who expect proof of planning.
Example
A Chennai die-casting shop wins an order for a gearbox housing. Before tooling is released, a team lists the critical dimensions, studies likely failures, plans inspection points and runs 300 trial parts. Issues in porosity are found in the trial and fixed before the first lot of 5,000 goes out.
Records and checks
- Record the timeline, team members, risk analyses, control plan and the result of each phase review.
- Verify that every open action from the analysis is closed before moving to the next phase.
- The project lead owns the plan; the quality head signs each phase review.
Common mistakes
- Treating the paperwork as a customer formality and filling it after launch, which removes the whole benefit.
- Leaving production and inspection staff out of the team, so the control plan cannot be followed on the shop floor.