Air leak audit
An air leak audit is a planned walk through a plant's compressed air network to find, tag, estimate and fix leaks that waste compressor energy.
What it means
The auditor listens for hissing, uses an ultrasonic leak detector or soapy water on joints, and tags each leak. The loss can be estimated by a compressor load test during a non production period. Fixing leaks lets the compressor work less, so the unit saves electricity, and sometimes the pressure can be lowered. Audits are repeated because new leaks form as hoses and fittings age.
Example
A forging unit in Ludhiana tags 38 leaks on a Sunday with the plant idle. After replacing hoses and fittings, the compressor's loaded time falls from 70 percent to 52 percent, saving about ₹14,000 of electricity a month.
Records and checks
- Record each leak's location, tag number, estimated size, repair date and who fixed it.
- Verify the fix with a second test and compare compressor load and kWh before and after.
- The maintenance head reviews the log, and the plant manager checks the saving on the electricity bill.
Common mistakes
- Fixing leaks once and never inspecting again.
- Tagging leaks with no tag follow up, so none are actually repaired.