Bend deduction
Bend deduction is the amount subtracted from the sum of the two outside flange dimensions of a bend to arrive at the correct flat length of the part.
What it means
It is another way to express the same bend geometry as bend allowance. Instead of adding an arc to inside flats, you measure the outside dimensions on the drawing and subtract a correction for each bend. Shops like it because drawings usually dimension the outside of a part.
Example
A bracket is drawn with outside legs of 40 mm and 60 mm with one 90 degree bend in 2 mm sheet. If the bend deduction is 3.6 mm, the flat blank is 40 plus 60 minus 3.6, or 96.4 mm long.
Records and checks
- Record the material, thickness, angle, radius, die opening and the deduction value proven in trial.
- Verify the first bent piece against the drawing with a vernier caliper before releasing the full lot.
- The press brake programmer owns the table of values, and the quality inspector checks the first piece.
Common mistakes
- Applying the same deduction to a different thickness or die, where the value differs.
- Forgetting that a part with several bends needs one deduction per bend, not a single total.