Buffer stock

Buffer stock is the extra quantity of an item kept beyond normal needs, so production or sales do not stop when supply is late or demand jumps.

What it means

Buffer stock, also called safety stock, sits on top of the quantity you expect to use during the supplier's lead time. You dip into it only when a delivery slips or a customer orders more than forecast. Too little causes stock-outs; too much ties up cash and space.

Example

A bolt maker uses 400 kg of steel wire a week, and the supplier has been up to one week late. The owner keeps 400 kg as buffer, worth about ₹32,000 at ₹80 per kg.

Records and checks

  • Record the buffer quantity per item, the date it was last revised and the reason for the figure.
  • Verify each quarter how often the buffer was used and how late the supplier really was.
  • The stores in-charge proposes the figure; the purchase head approves any change.

Common mistakes

  • Fixing one buffer for every item instead of sizing it by supplier delays and the cost of a stock-out.
  • Never revising it after demand changes, so it quietly grows into dead stock.