Capacity utilisation
Capacity utilisation is actual output, or hours used, divided by the output or hours the plant or machine could have delivered in the same period, shown as a percentage.
What it means
It shows how much of what you own is working for you. Low utilisation means fixed costs are spread over less output, while very high utilisation leaves no room for rush orders or breakdowns. Define the denominator clearly, whether it is total hours in the day, scheduled shift hours or rated machine output, so comparisons stay fair.
Example
A plastics unit has 4 moulding machines scheduled for 200 hours each in a month, so 800 hours. They actually run 560 hours. Utilisation is 70 percent, which suggests either low orders or loss from changeovers and stoppages.
Records and checks
- Record the available hours or rated output, run hours or actual output, by machine and period.
- Verify that run hours come from machine logs or job cards, not from estimates.
- The production head reviews it monthly, and the owner compares it with order book strength.
Common mistakes
- Using 24 hours a day as available capacity when the plant runs one shift.
- Reading high utilisation as good news without checking whether the output was good or just busy.