Central kitchen
A central kitchen is one production facility that prepares food, sauces or semi-finished items in bulk and supplies them to several outlets of the same business.
What it means
Instead of every outlet cooking from raw ingredients, the central kitchen does the heavy preparation, such as cutting, marinating, cooking gravies and portioning, and sends it by insulated transport. Outlets finish and serve it. The aim is consistent taste, lower wastage, bulk buying and fewer skilled staff at outlets. It needs strong planning, because outlets depend on timely supply.
Example
A biryani chain with six outlets cooks its gravy and marinates meat at one central kitchen, sending it every morning. Outlets only cook the rice and assemble. The central kitchen plans quantities from each outlet's order list by 8 pm the day before.
Records and checks
- Record outlet orders, production batches, dispatch quantities, temperatures, time and receipt by outlet.
- Verify the outlet's received quantity against the dispatch note, and check temperatures on arrival.
- The kitchen head plans production and the outlet manager confirms receipt each morning.
Common mistakes
- Producing from a rough guess, so one outlet runs out while another throws food away.
- Skipping temperature checks during transport.