CNC program

A CNC program is a set of coded instructions, often G-code, that tells a computer-controlled machine the tool path, speeds, feeds and tool changes for a part.

What it means

The program is written by a programmer or generated by CAM software from the part drawing, then loaded on the machine. It is specific to a machine, controller, fixture and tooling. Edits made at the machine, if not saved back, leave the next operator running the old version.

Example

A shop makes 500 flanges a month on a vertical machining centre. The programmer revises the drilling sequence to save 40 seconds a piece. The old program stays on the machine's memory card, and a night shift operator runs it, producing 60 pieces at the old cycle time.

Records and checks

  • Record the program number, revision, part drawing revision, machine, tooling list and who approved it.
  • Verify that the program on the machine matches the approved revision before the first piece is cut.
  • The programmer controls the master copy, and the supervisor confirms the revision at each setup.

Common mistakes

  • Editing a program at the machine and never saving the change back to the master.
  • Keeping programs on personal pen drives with no backup or revision tracking.