Competency matrix
A competency matrix is a grid listing employees against the skills a job needs, showing each person's current skill level.
What it means
Rows hold workers and columns hold skills such as operating a lathe, reading drawings or billing. Each cell carries a level, for example 0 for untrained up to 4 for able to train others. It shows who can cover for whom, where the business depends on a single person, and who needs training.
Example
In a 10-person machining shop only one operator is rated 4 on CNC setup. The matrix makes the risk visible, so the owner trains two others over three months before that operator takes planned leave.
Records and checks
- Record each person's skill ratings with the assessment date and the assessor's name.
- Verify ratings by a short practical demonstration, not by self-rating.
- The line supervisor assesses, HR keeps the matrix, and the owner uses it for training and promotions.
Common mistakes
- Filling levels from opinion without watching the work, which makes the matrix flattering rather than useful.
- Preparing it once and never updating it after training.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →