lamp.
ResourcesPricingAbout

Current ratio

Current ratio is current assets divided by current liabilities, showing whether a business has enough short-term resources to pay what it owes within a year.

What it means

Current assets are cash, receivables, stock and similar items expected to turn into cash within twelve months. Current liabilities are payables, short-term loans and dues payable in the same period. A ratio above 1 means assets exceed dues, but quality matters: slow-moving stock and old receivables inflate the figure. Banks often set a minimum ratio in loan terms, so owners watch it.

Example

A hardware wholesaler has ₹60 lakh of current assets, of which ₹18 lakh is stock unsold for over a year, against ₹40 lakh of current liabilities. The ratio is 1.5, but without the dead stock it is closer to 1.05.

Records and checks

  • Record balance sheet groupings so every account is tagged current or non-current.
  • Verify that old receivables and obsolete stock are written down or flagged before the ratio is quoted.
  • The accountant calculates it quarterly, and the owner and the lender read it.

Common mistakes

  • Treating a loan instalment due next year as non-current, which understates current liabilities.
  • Celebrating a high ratio that is built on stock which will not sell.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →