Data lake
A data lake is a large storage area that holds raw data from many sources in its original form, ready to be processed later for analysis.
What it means
Unlike a warehouse, where data is tidied and structured first, a lake accepts files, logs, sensor readings and exports as they come. The structure is applied when the data is read. It suits firms with many data sources and analysts who want to explore, but it needs discipline or it turns into a dump nobody trusts. Most small businesses do not need one.
Example
A cold chain operator in Chennai stores temperature readings from 120 trucks every minute in a lake. After a customer complaint, an analyst pulls readings for one trip and shows a 40 minute rise above limit.
Records and checks
- Record the source, load date and format of every dataset stored.
- Verify files are complete and not duplicated before use.
- The data owner controls access and retention.
Common mistakes
- Storing everything with no catalogue, so nobody can find or trust anything.
- Building one before there is a question that needs it.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →