Data warehouse
A data warehouse is a central store that collects cleaned and structured data from several operational systems, organised for reporting and analysis.
What it means
Sales may sit in one system, stock in another and payroll in a third. The warehouse pulls selected data from each on a schedule, aligns codes and dates, and keeps history, so a single report can compare them. Heavy reports then run there and do not slow the daily systems. It suits larger or multi-site firms more than a single-shop business.
Example
A distributor with six depots in Gujarat loads sales and stock into a warehouse every night. The owner can compare depot margins for the last 24 months in one view, which earlier took the accountant three days.
Records and checks
- Record the source, load time and transformation rules of each table.
- Verify load totals against source system totals each night.
- The data owner monitors failed loads; finance confirms money figures.
Common mistakes
- Loading data from sources that use different item codes without aligning them.
- Letting nightly loads fail unnoticed, so reports show old figures.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →