Defect density
Defect density is the number of defects found divided by a unit of output size, such as per 100 pieces, per square metre of fabric or per metre of weld.
What it means
It differs from a rejection rate, which counts faulty pieces; one piece may hold several defects. Using a common unit lets you compare lots of different sizes. Density is common in textiles, castings, printing and welding, where one item can show many flaws. The type and severity of defect should also be recorded.
Example
A fabric mill inspects a 400 metre roll and finds 12 flaws, giving 3 defects per 100 metres. A second roll of 250 metres has 9 flaws, or 3.6 per 100 metres. The second roll is worse despite having fewer flaws.
Records and checks
- Record the lot size, the number and type of defects, the inspection method and the inspector.
- Verify the unit of measure is the same across lots being compared.
- The quality inspector counts, and the quality head reviews the trend and sets the limit buyers will accept.
Common mistakes
- Comparing raw defect counts of lots with very different sizes.
- Counting a minor cosmetic mark the same as a defect that makes the product unusable.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →