lamp.
ResourcesPricingAbout

Diesel cost per unit

Diesel cost per unit is the fuel cost for each kilowatt hour a diesel generator produces, calculated as diesel cost divided by units generated.

What it means

It lets an owner compare generator power with grid power in the same terms. If diesel is ₹90 per litre and the set gives three units per litre, fuel alone costs ₹30 per unit, before servicing and wear. That is usually far above the grid rate. The figure also reveals poor loading or a faulty engine, because the units per litre drop.

Example

A garment factory in Tiruppur spends ₹1,44,000 on diesel in a month, and its energy meter shows the DG set produced 4,200 units. Cost per unit is 1,44,000 divided by 4,200, or about ₹34.3, against a grid rate of ₹8.

Records and checks

  • Record monthly diesel cost, units generated from the generator's energy meter and running hours.
  • Verify units come from a working meter, not an estimate from run time.
  • The accountant calculates the figure monthly and the owner examines the trend against grid cost.

Common mistakes

  • Ignoring servicing, oil and depreciation, which makes generator power look cheaper than it is.
  • Estimating units from kVA rating and run hours, which overstates the output.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →