Dispatch technician
Dispatching a technician is assigning a service job to a field engineer with the customer address, problem details, time window and the parts needed.
What it means
The decision balances skill, location, workload and urgency. A dispatcher picks the person best placed to fix the fault in one visit, then informs both the technician and the customer. Good dispatch also checks that spare parts and tools are with the technician before they leave. It is the step between receiving a complaint and a repair actually happening.
Example
A customer in Pune reports an air conditioner that is not cooling. The dispatcher finds a technician already working two kilometres away who has handled this model, gives him the afternoon slot, and has the compressor relay added to his van stock.
Records and checks
- Record the job number, technician, assigned time, customer slot, address and parts issued.
- Verify that the customer has confirmed the slot and the technician has the contact number.
- The service coordinator dispatches and the manager reviews late arrivals and reassigned jobs.
Common mistakes
- Assigning by who is free instead of who has the skill, which leads to a second visit.
- Not telling the customer the time window, so nobody is home when the technician arrives.