lamp.
ResourcesPricingAbout

Drilling

Drilling is a machining process that makes a round hole in a workpiece using a rotating drill bit fed along its axis.

What it means

It can be done on a hand drill, a pillar drill, a radial drilling machine or a CNC machine. The hole size is set by the bit, while position is set by marking, a jig or program. Speed, feed and coolant need adjusting to the metal, since stainless steel behaves very differently from mild steel.

Example

A fabricator drills 16 holes of 12.5 mm in a 10 mm base plate for M12 bolts. It uses a jig for position and coolant, and checks the first plate with a go gauge before drilling the other 60 plates in the order.

Records and checks

  • Record the hole size, depth, count, drill type, machine and the jig or program used.
  • Verify position and diameter on the first piece and again at set intervals during the batch.
  • The operator measures during the run, and the quality inspector signs off the final batch.

Common mistakes

  • Running a worn drill bit, which makes holes oversize or off-centre and ruins the part.
  • Drilling without a centre punch or guide, so holes wander from the marked position.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →