Dye lot
A dye lot is one batch of fabric or yarn dyed together under the same conditions, so its shade is consistent within the lot but may differ from other lots.
What it means
Even with the same recipe, shade can vary slightly between batches because of temperature, time, water and dye strength. Garment makers therefore ask for fabric from one lot for one order, or at least for each lot to be kept separate. Lot numbers on fabric rolls allow shade checks and traceability when a complaint arrives.
Example
A uniform supplier in Coimbatore receives 3,000 metres of navy fabric in two dye lots. Garments cut from lot A and lot B look different side by side, so the supervisor keeps each lot to separate cutting lays and one batch of garments.
Records and checks
- Record the dye lot number, roll numbers, length and shade check result.
- Verify the shade of each lot against the approved standard before cutting.
- Quality inspects incoming lots; the cutting head keeps lots separate.
Common mistakes
- Mixing rolls from different lots in one lay to finish faster.
- Dropping the lot number from the roll record, so later complaints cannot be traced.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →