lamp.
ResourcesPricingAbout

Emergency evacuation

Emergency evacuation is the orderly movement of all people out of a building or area to safety when a fire, gas leak, collapse or similar danger threatens.

What it means

When an alarm sounds, people should stop work, leave by the nearest safe route and go to the assembly point, without collecting belongings or using lifts. Machines are made safe only if that can be done in seconds. Named persons guide people, check rooms and count headcount outside.

Example

A fire alarm rings in a 40-person garment unit at 3 pm. Floor wardens clear the cutting hall and stitching floor, and all 40 reach the yard in four minutes. The warden then reports that the store room is empty.

Records and checks

  • Record the alarm time, the time everyone was out, the headcount, the route used and any problem noticed.
  • Verify that exits stayed open, the alarm was audible everywhere and the visitor register was used for the count.
  • The floor warden checks the area, and the safety officer and owner review the outcome.

Common mistakes

  • Letting people stop to switch off machines or fetch bags, which delays the exit.
  • Having no one assigned to account for visitors and contract staff.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →