Engineering change order
An engineering change order is the approved, numbered instruction to implement a design or process change, stating the affected items, the new revision and the date it takes effect.
What it means
After a change has been requested and assessed, this order turns the decision into action. It lists drawings and parts to be updated, tasks for each department and the cut-in point, which may be a date or a serial or batch number. A good order also states what to do with old stock and half-finished work, because that is where the cost of change usually hides.
Example
At a Nashik valve plant, a ball valve seat material changes from PTFE to reinforced PTFE. The order covers batches from 15 August, tells stores to hold 600 old seats for spares only, and asks quality to add a leak test at the higher pressure. Production uses the new seat from the first batch after the cut-in.
Records and checks
- Record the order number, linked request, items changed, cut-in point and disposition of old stock.
- Verify that the cut-in point is clear on the shop floor and that completed actions are signed off.
- The engineering head approves; each department head signs its completed task.
Common mistakes
- Issuing the order verbally to the shop and updating paperwork later, causing mixed batches.
- Skipping the cost of scrapped old parts in the decision, so the true impact is underestimated.