Equipment commissioning

Equipment commissioning is the process of installing, testing and confirming that new or relocated equipment works as specified before it is handed over for regular production.

What it means

It begins when the machine arrives and ends when it is accepted for use. Typical steps are checking the delivery against the order, positioning and levelling, connecting power and utilities, trial runs, calibration and operator training. It ends with acceptance, which starts any warranty period. Careful commissioning reveals faults while the supplier is still responsible.

Example

A bakery receives a new dough mixer worth ₹2,10,000. The vendor installs it, runs three trial batches, checks motor current and safety stops, trains two operators and gets the owner's signed acceptance.

Records and checks

  • Record delivery condition, installation date, test results, settings, training and the acceptance date.
  • Verify performance against the specification and the order before signing acceptance.
  • The maintenance lead and production head test it; the owner signs acceptance and releases final payment.

Common mistakes

  • Putting the machine into production before testing, and then arguing about a fault with the vendor.
  • Not noting the acceptance date, so warranty periods are unclear.