Evacuation drill

An evacuation drill is a planned practice in which everyone leaves the premises as in a real emergency, so alarms, exit routes, roles and headcounts can be tested.

What it means

People who have never practised an exit often freeze, take the wrong door or stop to collect things. A drill shows what works and what does not under mild pressure. Hold drills on different shifts. Someone observes with a stopwatch, and a short review follows to fix weak points such as blocked passages, an inaudible alarm or a missing count.

Example

A distributor's warehouse runs a drill at the start of the night shift. Everyone is out in five minutes, but the observer notes that the rear exit was blocked by pallets. They are cleared, and the point is closed.

Records and checks

  • Record the date, shift, start and finish time, headcount, observations and the actions agreed.
  • Verify that each action raised in the last drill was completed before the next one.
  • The safety coordinator runs it, observers record it, and the owner signs the report.

Common mistakes

  • Holding the drill only during the day when most staff are present, so night shift never practises.
  • Recording the drill without the time taken or problems seen.