Failure mode and effects analysis
Failure mode and effects analysis is a structured method that lists the ways a product or process could fail, ranks their risk and records actions to prevent or detect them.
What it means
You break a product or process into steps or functions. For each, you note what could go wrong, what the effect would be, what causes it and how it would be noticed. Scores for severity, how often it might occur and how easily it is detected rank the risks. Work then goes first to the high ones. It can be applied to a design or to a process, and its value lies in doing it before problems occur.
Example
A frozen snack plant in Surat applies the method to its packing line. One failure mode is a missed seal, with effect of spoiled product reaching shops. Detection is weak since checks are visual. The team adds a leak test on every tenth pack and a seal temperature alarm.
Records and checks
- Record each item with its failure mode, effect, cause, ratings, action and later re-rating.
- Verify that actions are completed and the new risk scores are lower than the originals.
- A cross-functional team prepares it; the quality head reviews and signs.
Common mistakes
- Letting one person fill it alone at a desk, so shop-floor knowledge never enters the analysis.
- Using it once for a customer audit and never updating it when a problem occurs.