Flash defect

A flash defect is a thin, unwanted fin of plastic on a moulded part, usually along the mould's parting line or around inserts and vents.

What it means

Flash forms when molten plastic escapes between mould surfaces that should be sealed. Causes include insufficient clamp force, worn or damaged parting faces, dirt on the mould, excess injection or holding pressure and a melt that is too hot and runny. Flash is a problem for appearance, fit and safety, and it needs trimming or scrapping. The cure is to find the cause, not to keep trimming.

Example

A plant moulds 200 connector housings an hour. Flash appears on one edge, and operators trim it by hand, adding two people to the line. The mould maintenance team finds a worn parting face on one side and re-polishes it. Flash disappears, and the two trimmers go back to packing.

Records and checks

  • Record the defect, the cavity, the date, the settings in use and the quantity trimmed or rejected.
  • Verify the first article and then hourly samples for flash, and check the mould parting line at each maintenance.
  • The operator reports, the setter investigates the settings, and maintenance repairs the mould if it is worn.

Common mistakes

  • Trimming flash by hand for months instead of repairing the mould.
  • Raising the clamp force on a worn mould until the tool itself is damaged.