Forecast accuracy
Forecast accuracy is a measure of how close a forecast was to the actual result, commonly shown as 100 percent minus the average percentage error.
What it means
To measure it, compare forecast and actual for each item and period, work out the percentage difference, and average across items. It is more useful at item level than for the grand total, since over- and under-forecasts across items cancel out. It helps decide how much safety stock to hold and where to improve planning.
Example
A garment maker forecast 1,000 shirts for a style and sold 850, an error of 15 percent. For another style, forecast 600 and sold 660, an error of 10 percent. Average error is 12.5 percent, so forecast accuracy is about 87.5 percent.
Records and checks
- Record the forecast, the actual quantity, the period and the date the forecast was made.
- Verify that actuals include all channels and that the same period is compared.
- The planner calculates it, and the sales head reviews the items with the largest misses each month.
Common mistakes
- Judging accuracy only on the grand total, where big errors on individual items cancel out.
- Comparing the actual with a forecast revised after the period began.