Four point system
The four point system grades fabric by giving each defect one to four penalty points by size, then compares the points per area with an acceptance limit.
What it means
Smaller flaws get fewer points and larger ones, such as holes, get the most, with a cap on points for one metre of length. Points are added for each roll and converted to a figure per 100 square metres or yards, using the formula the buyer specifies. The buyer's limit decides whether a roll passes. Its aim is a fair, consistent score between supplier and buyer.
Example
A 100 metre roll in a Ludhiana factory scores 38 points. Converted to points per 100 square metres, it is under the buyer's limit, so it is accepted. A neighbour roll scoring above the limit is held for a supplier claim.
Records and checks
- Record each defect's size, points, location and the roll total.
- Verify the conversion formula and limit agree with the buyer's specification.
- The inspector scores; quality head approves the accept or reject decision.
Common mistakes
- Using a different limit from the buyer's, so accepted rolls get rejected later.
- Giving points inconsistently between inspectors.