lamp.
ResourcesPricingAbout

Freight rate

A freight rate is the price a carrier or forwarder charges for moving goods, quoted per kilogram, per cubic metre, per trip, per container or per package.

What it means

Rates depend on route, weight or volume, goods type, vehicle or container size, season and urgency. Full-truck loads are often priced per trip, part loads per kg or per package, and sea freight per container or per CBM. A rate sheet agreed in advance avoids arguments at billing time. Rates change, so a quote from last year is not a safe guide.

Example

A transporter quotes ₹4.80 per kg for part loads from Coimbatore to Hyderabad, with a minimum charge of ₹600. A 90 kg parcel costs ₹600, because 90 kg at the rate would be only ₹432.

Records and checks

  • Record the agreed rate, its basis, validity period and minimum charge for each route.
  • Verify the bill's weight, rate and extras against the rate sheet before approving payment.
  • The purchase or dispatch lead negotiates and updates rates; accounts checks every bill against them.

Common mistakes

  • Comparing two quotes with different bases, such as one per kg and one per trip.
  • Forgetting minimum charges and loading or unloading fees when judging the real cost.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →