Gross vehicle weight
Gross vehicle weight is the total weight of a vehicle with its cargo, fuel, driver and other items on board at a given moment.
What it means
A truck has a rated limit for the maximum gross weight it may carry, shown in its registration papers or on a plate. Staying within the limit protects tyres, brakes and axles and avoids fines at checkpoints. The load a truck can carry is that limit minus the empty weight. Weighbridges at factories and warehouses give the actual figure for each trip.
Example
A truck with an empty weight of 7,500 kg and a rated gross limit of 16,200 kg can carry at most 8,700 kg of cargo. A weighbridge ticket shows 16,900 kg, so 700 kg must be unloaded.
Records and checks
- Record the empty weight, loaded weight and weighbridge ticket number for each dispatch.
- Verify loaded weight against the vehicle's rated limit before it leaves the gate.
- The weighbridge operator records readings; the dispatch supervisor stops any overloaded vehicle.
Common mistakes
- Judging a load by eye or by invoice weight and skipping the weighbridge.
- Forgetting that packing, pallets and tie-down material add weight.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →