lamp.
ResourcesPricingAbout

HP

HP is the common abbreviation for horsepower, the rating printed on Indian motors, pumps and engines; 1 HP equals about 0.746 kW.

What it means

On a nameplate or quotation, "7.5 HP" tells the size of the motor. For billing and load planning, convert it to kilowatts by multiplying by 0.746, so 7.5 HP is about 5.6 kW. HP also appears in vehicle engines, though there the figure often comes from a different test method. In an engineering workshop, HP is the shorthand people use when asking for a replacement motor.

Example

A flour mill in Indore has three motors of 15 HP, 10 HP and 7.5 HP. Their total of 32.5 HP is about 24.2 kW. The owner uses that figure to check against the connection's sanctioned load.

Records and checks

  • Record HP for each motor along with kW, voltage, current and make from the nameplate.
  • Verify the total against the sanctioned load on the electricity connection.
  • The electrical supervisor updates the list when a motor is rewound or replaced.

Common mistakes

  • Ordering a replacement of the same HP without checking the pole count or speed.
  • Mixing HP and kW in one total without conversion.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →