Human in the loop
Human in the loop is a design in which a person takes part in an automated process, reviewing, correcting or approving selected steps before the result is final.
What it means
Full automation is not always wise. In a human-in-the-loop design the machine does the heavy reading and drafting, and a person checks where judgement or accountability matters. The person may review every item, only unusual ones, or a sample. Over time their corrections show where the automation is weak. Choose placement by risk: more review for money and customer-facing steps, less for internal sorting.
Example
A spare-parts firm's system reads 120 supplier bills a week. The accountant reviews only the 15 flagged as low-confidence or above ₹50,000, and spot-checks five of the rest.
Records and checks
- Record which items reached a person, what they changed and how long it took.
- Verify that the review step cannot be bypassed and that corrections are fed back.
- The process owner reviews the share of items needing correction to tune the design.
Common mistakes
- Putting a person at the end only to rubber-stamp, with no time or information to check.
- Reviewing everything forever, which removes the time saving.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →