Inspection report
An inspection report is a record of what was inspected, how, the measured results, the defects found and the final decision on the product or lot.
What it means
It is the written outcome of an inspection and often travels with the goods or is shared with a customer. A useful report identifies the product, lot and date, lists the characteristics checked with actual readings, states the limits, and ends in a clear accept, reject or hold. Readings, not only ticks, make it possible to trace what went wrong later.
Example
A cutting-tool maker sends a customer a report for lot 4471: 32 pieces measured, diameters between 9.98 and 10.01 mm against 10.00 plus or minus 0.02, hardness 61 to 63 HRC, two pieces with visible chips rejected. The customer uses it to clear the goods at receipt.
Records and checks
- Record the product, lot, date, inspector, instruments, readings, defects and decision.
- Verify that the instrument IDs and calibration dates are stated.
- The inspector signs, the quality head approves, and copies are filed against the dispatch.
Common mistakes
- Writing "OK" without the actual readings, which proves nothing in a dispute.
- Signing reports after the goods have already been dispatched.