Interest coverage ratio
The interest coverage ratio divides operating profit before interest and tax by interest expense, showing how comfortably a business can pay the interest on its borrowings.
What it means
A ratio of 1 means all operating profit goes to the lender. Higher is safer. Lenders check it before sanctioning or renewing a loan, and owners use it to judge whether new borrowing is affordable. It uses profit, not cash, so read it with cash flow.
Example
A packaging unit earns operating profit of ₹18,00,000 in the year and pays ₹6,00,000 as interest. Its coverage is 3 times. After taking another loan that lifts interest to ₹12,00,000, coverage drops to 1.5 times, which a bank may treat as thin.
Records and checks
- Record operating profit and total interest, including interest on overdraft and bill discounting, for the same period.
- Verify that one-off gains are excluded from operating profit.
- The accountant calculates it each quarter and the owner reviews the trend before any new borrowing.
Common mistakes
- Leaving out interest on working capital limits, which makes coverage look better than the bank will calculate it.
- Using profit after interest in the numerator, which understates the ratio.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →