Job safety analysis
Job safety analysis is a method that splits a task into its steps, identifies the hazards in each step and decides the controls needed before work begins.
What it means
Instead of judging a whole job as safe or unsafe, the team writes down each step in order, such as isolating the machine, removing the cover, cleaning, refitting. For every step it asks what can go wrong and what will prevent it. The people who actually do the job should take part, because they know the shortcuts that cause trouble.
Example
Cleaning a mixing tank in a paint unit has six steps. The team notes fumes at step three and a slip risk at step five, and adds a gas check, a second person outside the tank and non-slip boots before the ₹2,500 contractor starts.
Records and checks
- Record each step, its hazard, the control and the person responsible for the control.
- Verify the controls are physically available at the site before work starts.
- The supervisor and the workers doing the task sign the sheet; the safety officer reviews high-risk ones.
Common mistakes
- Copying an old sheet for a different job without walking the site.
- Filling it in at the desk without asking the workers who do the task.