Lab sample
A lab sample is a specimen, such as blood, urine, swab or tissue, collected from a patient and sent to a laboratory for testing.
What it means
Result quality starts at collection. The right container, fasting status, volume, labelling and storage temperature all affect the answer. Each sample gets a unique ID that links it to the patient and the ordered tests. If the specimen is clotted, leaking, mislabelled or too old, the lab may reject it and ask for a fresh draw, which delays the report.
Example
A collection centre draws a fasting blood sample at 7:45 am for a glucose test. The phlebotomist labels the tube at the bedside, notes the time and fasting status, and places it in a cool box for the courier pickup at 9 am.
Records and checks
- Record the sample ID, patient, collection time, type of container, fasting status and collector.
- Verify the label against the requisition at the time of collection, with the patient present.
- The phlebotomist labels, and the lab technician checks condition and volume at receipt.
Common mistakes
- Labelling tubes before drawing, which risks a swap between patients.
- Leaving samples at room temperature for too long before pickup.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →